Project: Septic Tank Replacement For School
Date: July 2013
Location: Co. Kildare
System Type: bioCycle™ 48,000 Series
System Design: “Fit for Purpose” & Local Authority Planning Requirements
Description:
A major extension was being built on a national school in Co. Kildare. The site was serviced by an existing malfunctioning septic tank system that need upgrading.
BioCycle were commissioned as part of the planning process to design a wastewater treatment system and soil polishing filter. Planning was granted and BioCycle were subsequently selected to supply, install and certification of the wastewater treatment system.
bioCycle™ provided a turn key solution by removing the existing septic tank system and installing the new bioCycle wastewater treatment system. The system was installed in the summer of 2013 and was fully commissioned and operational before the start of the school year.